Determining Project Contingency Reserve Using a Fuzzy Arithmetic-Based Risk Analysis Method

Date
2020-01-07
Authors
Fateminia, Seyed Hamed
Siraj, Nasir Bedewi
Fayek, Aminah Robinson
Johnston, Andrew
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
Traditional techniques for estimating contingency reserve fail to capture subjective uncertainties and expert knowledge, and they rely on historical data. This paper proposes a fuzzy risk analysis model (FRAM) that uses fuzzy arithmetic to analyze risk and opportunity events and determine construction project contingency reserve. The FRAM allows experts to use natural language to assess the probability and impact of risk and opportunity events by employing linguistic scales represented by fuzzy numbers, thus addressing the data reliance problem of probabilistic methods. It enables experts to customize linguistic scales and fuzzy numbers for different project types and stages. The FRAM also deals with the challenges associated with deterministic approaches by addressing measurement imprecision and the subjective uncertainty of experts’ opinions. Moreover, the FRAM allows analysts to estimate contingency at different levels of confidence. This paper also illustrates Fuzzy Risk Analyzer© (FRA©), software that implements the fuzzy arithmetic procedure of the FRAM.
Description
Keywords
Soft Computing: Theory Innovations and Problem Solving Benefits, contingency, fra, fram, fuzzy logic, quantitative risk analysis, risk management
Citation
Extent
10 pages
Format
Geographic Location
Time Period
Related To
Proceedings of the 53rd Hawaii International Conference on System Sciences
Table of Contents
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.