H2S abatement plan during drilling operations

dc.contributor.author Puna Geothermal Venture en_US
dc.date.accessioned 2014-11-17T23:18:25Z
dc.date.accessioned 2014-11-17T23:33:04Z
dc.date.available 2014-11-17T23:18:25Z
dc.date.available 2014-11-17T23:33:04Z
dc.date.issued 1991 en_US
dc.description.abstract "In the event that an unplanned venting of geothermal steam occurs during drilling operations, a plan has been established to abate the resulting HzS emissions. If a surge of geothermal fluid occurs during drilling, a rupture disc in the blowout prevention stack will break at between 150 psi and 175 psi, allowing the steam, gas, and fluid to flow through a vent line to an atmospheric separator (Figure 1). The flow of geothermal steam, fluid, and gas will be treated by injecting an aqueous solution of sodium hydroxide into the vent line. In the event that the flow of geothermal fluid is dry steam or nearly so, additional water can be injected into the vent line using the rig pumps. In order to determine the concentration of HzS emitted to the atmosphere, discrete samples of the steam will be withdrawn from the top of the atmospheric separator and analyzed using an accurate chemical test." en_US
dc.format.extent 10 pages en_US
dc.identifier.citation Puna Geothermal Venture. 1991. H2S abatement plan during drilling operations. Hilo (HI): Puna Geothermal Venture. en_US
dc.identifier.uri http://hdl.handle.net/10524/47110
dc.language.iso en-US en_US
dc.publisher Puna Geothermal Venture en_US
dc.subject drilling en_US
dc.subject environmental en_US
dc.subject Puna Geothermal Venture en_US
dc.subject air quality en_US
dc.subject environmental en_US
dc.subject Puna en_US
dc.subject.lcsh Hydrogen sulfide--Environmental aspects--Hawaii--Puna en_US
dc.subject.lcsh Geothermal power plants--Environmental aspects--Hawaii--Puna Region en_US
dc.subject.lcsh Geothermal resources--Environmental aspects--Hawaii--Puna Region en_US
dc.subject.lcsh Air quality--Standards--Hawaii en_US
dc.title H2S abatement plan during drilling operations en_US
dc.type Report en_US
dc.type.dcmi Text en_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
1991 - H2S Abatement Plan During Drilling Operations.pdf
Size:
2.63 MB
Format:
Adobe Portable Document Format
Description: