A Hybrid Approach of Modular Planning – Synchronizing Factory and Building Planning by Using Component based Synthesis
Files
Date
2020-01-07
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Narrator
Transcriber
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The more and more rising complexity of the industrial environment is triggering companies in a way that is more challenging than ever before. Not only are factory planning projects difficult to handle because of the dynamics and complexity also the necessary planning of the accompanied building gets more and more difficult. To handle this complexity and reduce time and effort for planning as a major factor of success the mainly separately done planning aspects needs to be synchronized. This paper will show an approach of a hybrid factory-building planning method in order to be able to shorten planning time and effort. By using a constraint solving technique the necessary planning tasks are aligned partly automatically and will be processed as a useful planning workflow in form of a gantt diagram for the overall project management.
Description
Keywords
Smart (City) Application Development: Challenges and Experiences, building planning, cominatory logic synthesizer, component based synthesis, factory planning, modular planning
Citation
Extent
9 pages
Format
Geographic Location
Time Period
Related To
Proceedings of the 53rd Hawaii International Conference on System Sciences
Related To (URI)
Table of Contents
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.