Validating the OPA Cascading Blackout Model on a 19402 Bus Transmission Network with Both Mesh and Tree Structures
Loading...
Files
Date
Contributor
Advisor
Editor
Performer
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Interviewee
Narrator
Transcriber
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Journal Name
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The OPA model calculates the long-term risk of cascading blackouts by simulating cascading outages and the slow process of network upgrade in response to blackouts.
We validate OPA on a detailed 19402 bus network model of the Western Electricity Coordinating Council (WECC) interconnection with publicly available data.
To do this, we examine scalings on a series of WECC interconnection models with increasing detail.
The most detailed, 19402 bus network has more tree structures at the edges of the main mesh structure, and we extend the OPA model to account for this.
The higher-risk cascading outages are the large cascades that extend across interconnections, so validating cascading models on large networks is crucial to understanding how the real grid behaves. Finally, exploring networks with mixed mesh and tree like structure has implications for the risk analysis for both the transmission grid and other network infrastructures.
Description
Citation
Extent
10 pages
Format
Type
Conference Paper
Geographic Location
Time Period
Related To
Proceedings of the 52nd Hawaii International Conference on System Sciences
Related To (URI)
Table of Contents
Rights
Attribution-NonCommercial-NoDerivatives 4.0 International
Rights Holder
Catalog Record
Local Contexts
Collections
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.
