Hawaii deep water cable program : phase II-C, task 1, environmental assessment

dc.contributor.authorKrasnick, George
dc.contributor.authorMansur, J.
dc.date.accessioned2014-02-25T19:02:03Z
dc.date.accessioned2014-02-25T19:23:11Z
dc.date.available2014-02-25T19:02:03Z
dc.date.available2014-02-25T19:23:11Z
dc.date.issued1987-08
dc.description.abstractThe "action" assessed in this document is installation and operation of a high voltage (300 kV), direct current electrical transmission system capable of transmitting 500 MW of power from the geothermal resource subzones of the Kilauea East Rift Zone of Hawaii to Maui (50 MW) and Oahu. At this level of power transfer, the submarine cable link would satisfy on the order of half of Oahu's demand for electricity. For environmental assessment purposes, a "preferred route" consisting of overland and submarine segments has been defined. The overland segments ("proposed corridor") were identified in a separate 'series of studies using an objective set of constraining criteria which when overlayed provided a means to visually distinguish between areas of higher and lower constraint. The areas of relatively lowest constraint were linked to give the proposed corridors on the three islands.
dc.description.sponsorshipFunding is being provided by the Hawaii Department of Business and Economic Development and the U.S. Department of Energy.
dc.format.extent237 pages
dc.identifier.citationKrasnick G, Mansur J. 1987. Hawaii Deep Water Cable Program, phase II-C: Executive summary. (HI): Parsons Hawaii.
dc.identifier.urihttp://hdl.handle.net/10524/36071
dc.language.isoen-US
dc.publisherParsons Hawaii
dc.relation.ispartofseriesHawaii Deep Water Cable Program Phase II
dc.subjectHawaii Deep Water Cable Program
dc.subjecttesting
dc.subjectHawaii
dc.subject.lcshElectric cables--Environmental aspects--Hawaii
dc.subject.lcshCables, Submarine--Environmental aspects--Hawaii
dc.subject.lcshElectric lines--Environmental aspects--Hawaii--Underground
dc.subject.lcshElectric power transmission--Environmental aspects--Hawaii
dc.titleHawaii deep water cable program : phase II-C, task 1, environmental assessment
dc.typeReport
dc.type.dcmiText
local.identifier.callnumberTK3351 .K73 1987

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1987-Aug-Phase II-C task 1 EA.pdf
Size:
5.14 MB
Format:
Adobe Portable Document Format