Report on uncontrolled flow event as per conditions #13 and #26, ATC no. A-833-795, attachment II, wellfield

dc.contributor.authorPuna Geothermal Venture
dc.date.accessioned2012-08-16T19:47:30Z
dc.date.accessioned2012-08-16T20:55:40Z
dc.date.available2012-08-16T19:47:30Z
dc.date.available2012-08-16T20:55:40Z
dc.date.issued1991-06-17
dc.descriptionIncludes a cover letter.
dc.description.abstractThis report covers the following five items: probable cause of the blowout, actions that have or will be taken, estimated time before the well is controlled, analysis of air quality impact from unabated emissions, and air quality monitoring plan.
dc.format.extent19 pages
dc.identifier.citationPuna Geothermal Venture. 1991. Report on uncontrolled flow event as per conditions #13 and #26, ATC no. A-833-795, attachment II, Wellfield. Pahoa (HI): Puna Geothermal Venture.
dc.identifier.urihttp://hdl.handle.net/10524/23409
dc.language.isoen-US
dc.publisherPuna Geothermal Venture
dc.subjectKS-8
dc.subjectKS-8 unplanned venting
dc.subjectwell blowout
dc.subjectventing
dc.subjectPuna Geothermal Venture
dc.subjectKapoho
dc.subjectKilauea
dc.subjectPuna
dc.subjectHawaii
dc.subjectKilauea Lower East Rift Zone
dc.subjectKilauea East Rift Zone
dc.titleReport on uncontrolled flow event as per conditions #13 and #26, ATC no. A-833-795, attachment II, wellfield
dc.typeReport
dc.type.dcmiText

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1991 - PGV Report Uncontrolled Flow Event.pdf
Size:
549.05 KB
Format:
Adobe Portable Document Format