The HGP-A generator facility : reservoir characteristics and operating history for EPRI research project 1195-12

dc.contributor.author Thomas, Donald M.
dc.date.accessioned 2013-03-21T20:30:45Z
dc.date.available 2013-03-21T20:30:45Z
dc.date.issued 1982
dc.description.abstract The HGP-A Geothermal Wellhead Generator Facility, located on the Lower East Rift Zone of Kilauea Volcano, was installed as a pilot project to demonstrate the technical feasibility of producing electrical power from the geothermal reservoir discovered by the HGP-A research well in 1976. The electrical generation facility was installed in June, 1981 and, after a number of initial startup problems, began commercial operation in March 1982; it has now been in operation for nearly 40 months. During this period a number of changes have occurred in the well fluid chemistry that have yielded insight into the character of the geothermal reservoir associated with the East Rift Zone and have identified a number of potential operating problems, for future geothermal facilities that may be installed on this reservoir.
dc.format.extent 7 pages
dc.identifier.citation Hawaii Institute of Geophysics, University of Hawaii at Manoa. 1982. The HGP-A Generator Facility: Reservoir Characteristics and Operating History for EPRI Research Project 1195-12. Honolulu, Hawaii: Hawaii Institute of Geophysics, University of Hawaii at Manoa.
dc.identifier.uri http://hdl.handle.net/10125/26759
dc.language.iso en-US
dc.publisher Hawaii Institute of Geophysics, University of Hawaii at Manoa
dc.subject Hawaii Geothermal Project
dc.subject production
dc.subject reservoirs
dc.subject Puna
dc.subject Hawaii
dc.title The HGP-A generator facility : reservoir characteristics and operating history for EPRI research project 1195-12
dc.type Report
dc.type.dcmi Text
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
1982 - EPRI Research Project 1195-12.pdf
Size:
238.75 KB
Format:
Adobe Portable Document Format
Description: