The HGP-A generator facility : reservoir characteristics and operating history for EPRI research project 1195-12
Date
1982
Authors
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Narrator
Transcriber
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Hawaii Institute of Geophysics, University of Hawaii at Manoa
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The HGP-A Geothermal Wellhead Generator Facility, located on the Lower East Rift Zone of Kilauea Volcano, was installed as a pilot project to demonstrate the technical feasibility of producing electrical power from the geothermal reservoir discovered by the HGP-A research well in 1976. The electrical generation facility was installed in June, 1981 and, after a number of initial startup problems, began commercial operation in March 1982; it has now been in operation for nearly 40 months. During this period a number of changes have occurred in the well fluid chemistry that have yielded insight into the character of the geothermal reservoir associated with the East Rift Zone and have identified a number of potential operating problems, for future geothermal facilities that may be installed on this reservoir.
Description
Keywords
Hawaii Geothermal Project, production, reservoirs, Puna, Hawaii
Citation
Hawaii Institute of Geophysics, University of Hawaii at Manoa. 1982. The HGP-A Generator Facility: Reservoir Characteristics and Operating History for EPRI Research Project 1195-12. Honolulu, Hawaii: Hawaii Institute of Geophysics, University of Hawaii at Manoa.
Extent
7 pages
Format
Geographic Location
Time Period
Related To
Related To (URI)
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.