Plugging procedures and suspension of drilling operations for injection well KS-7

Loading...
Thumbnail Image

Contributor

Advisor

Editor

Performer

Department

Instructor

Depositor

Speaker

Researcher

Consultant

Interviewer

Interviewee

Narrator

Transcriber

Annotator

Journal Title

Journal ISSN

Volume Title

Publisher

Puna Geothermal Venture

Journal Name

Volume

Number/Issue

Starting Page

Ending Page

Alternative Title

Abstract

"During the drilling of injection well KS-7, the Puna Geothermal Venture has encountered a high temperature, high pressure zone at depth of 1600'. This zone caused the fluid and steam release on the afternoon of February 21, 1991. Since that time the well has been shut in and is being kept in a stable condition by continuous pumping of cold water into the well bore. During this period equipment and personnel were assembled in order to plug the well. PGV is hereby requesting authorization to execute plugging and monitoring operations that we feel are required to bring the well to a stable and safe condition for the long term. This program is described in the attached document and figures."

Description

Subject Headings

Citation

Puna Geothermal Venture. 1991. Plugging procedures and suspension of drilling operations for injection well KS-7. Hilo (HI): Puna Geothermal Venture.

DOI

Extent

5 pages

Format

Type

Plan or blueprint
Report

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Catalog Record

Local Contexts

Endorsement

Review

Supplemented By

Referenced By

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.