There Is Still No "Fit for All" IS Development Method: Business Development Context and IS Development Characteristics Need to Match

Loading...
Thumbnail Image

Contributor

Advisor

Editor

Performer

Department

Instructor

Depositor

Speaker

Researcher

Consultant

Interviewer

Interviewee

Narrator

Transcriber

Annotator

Journal Title

Journal ISSN

Volume Title

Publisher

Journal Name

Volume

Number/Issue

Starting Page

Ending Page

Alternative Title

Abstract

Information systems development has returned to strategic management due to the increase of software-enabled businesses. We investigated two failed IS development projects using the exploratory case study method. One of the projects was executed with the plan-driven approach methods and the other with the change-driven (agile) approach methods. Data analysis showed that both projects followed the principles of the selected methods. That, however, was not enough. The plan-driven project achieved project objectives but did not deliver business value and the IS was never taken into use. The change-driven project delivered desired business value but failed to release a robust IS. Our main contribution to research is our proposition to match the characteristics of IS development methods with the characteristics of business development contexts. We also disclose some novel reasons for IS project failures.

Description

Citation

Extent

10 pages

Format

Type

Conference Paper

Geographic Location

Time Period

Related To

Proceedings of the 51st Hawaii International Conference on System Sciences

Related To (URI)

Table of Contents

Rights

Attribution-NonCommercial-NoDerivatives 4.0 International

Rights Holder

Catalog Record

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.