An economic analysis of the Kilauea geothermal development and inter-island cable project

Loading...
Thumbnail Image

Authors

Contributor

Advisor

Editor

Performer

Department

Instructor

Depositor

Speaker

Researcher

Consultant

Interviewer

Interviewee

Narrator

Transcriber

Annotator

Journal Title

Journal ISSN

Volume Title

Publisher

Northwest Economic Associates

Journal Name

Volume

Number/Issue

Starting Page

Ending Page

Alternative Title

Abstract

In early 1989 the Pele Defense Fund requested that Northwest Economic Associates (NEA) update their 1987 economic analysis of the proposed Hawaii Geothermal Development And Inter-island Cable Transmission System Project. This report, the result of that request, once again compares the cost of building and operating 500 MW of geothermal power plants and a cable transmission system with the cost of building and operating 500 MW of oil-fired power plant generating capacity. This update also compares the geothermal project with a solar/oil hybrid generating system of the same size. The impact of energy conservation is also considered in terms of its potential as an energy resource and in its contribution to an energy development program for the state of Hawaii. This report develops low and high cost estimates for the project. In a project laced with as much uncertainty as this, a single cost figure is of little value. A range of values which attempts to account for some of the uncertainty seems a more logical approach to cost estimation. Our cost estimates include costs which should have been considered in the February 1988 Decision Analysts Hawaii, Inc. report for the State, but were not. The most obvious being a standard project cost contingency. Other costs not considered in the State report but included in this report are the following: 1) additional cost of the undersea cable to allow for slope changes on the sea floor, 2) cost of constructing the cable laying vessel which does not yet exist, 3) cost of helper vessels to assist in the cable laying, and 4) adequate insurance or plant replacement costs. A cost that neither the State report nor this report includes, but one that may be very important, is the cost of designing or protecting the plants to deal with geologic hazards. The added cost of strengthening plants, designing them for quick disassembly, or constructing protective barriers around them will be considerable. This report considers project costs as objectively as possible considering the great deal of uncertainty and high level of risk involved in the project. All costs are shown in 1990 dollars. Appendix C contains two criticisms of the February 1988 Decision Analysts Hawaii, Inc. report on the proposed geothermal project.

Description

Prepared at the request of the Pele Defense Fund. Cf. Introd. Includes bibliographical references.

Citation

Northwest Economic Associates. 1990. An economic analysis of the Kilauea geothermal development and inter-island cable project. Vancouver (WA): Northwest Economic Associates.

DOI

Extent

162 pages

Format

Type

Report

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Catalog Record

Local Contexts

Endorsement

Review

Supplemented By

Referenced By

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.