Venting/testing KS-8

dc.contributor.author Puna Geothermal Venture en_US
dc.date.accessioned 2015-07-06T23:49:20Z en_US
dc.date.accessioned 2015-07-07T22:25:29Z
dc.date.available 2015-07-06T23:49:20Z en_US
dc.date.available 2015-07-07T22:25:29Z
dc.date.issued 1991-06 en_US
dc.description.abstract From cover letter: "Puna Geothermal Venture is planning to run a 24-hour rig test of well KS-8 which is currently being drilled (Figure 1). This rig test will consist of flowing KS-8 with the drill rig on the well. The test will take place on or shortly after June 24, 1991. The rig test program (Attachment A) is attached for your review. The Pursuant to Condition No. 18 of the Authority to Construct No. A-833-795 for Puna Geothermal Venture (PGV) , PGV is required to submit a chemical treatment plan for abatement of H2S during flow testing. The chemical treatment plan used for the flow testing of KS-3 will be used for the KS-8 rig test and will be implemented using the same test facility (Figure 2). A copy of that program is attached (Attachment B). The treatment plan for KS-3, which was reviewed by your staff, proved to be highly effective in maintaining H2S emmission levels well below permit limits." en_US
dc.format.extent 22 pages en_US
dc.identifier.citation Puna Geothermal Venture. 1991. Venting/testing KS-8. Hilo (HI): Puna Geothermal Venture. en_US
dc.identifier.uri http://hdl.handle.net/10524/47990
dc.language.iso en-US en_US
dc.publisher Puna Geothermal Venture en_US
dc.subject KS-8 en_US
dc.subject Puna Geothermal Venture en_US
dc.subject well testing en_US
dc.subject well monitoring en_US
dc.subject venting en_US
dc.subject Hawaii en_US
dc.subject Big Island en_US
dc.subject Puna en_US
dc.subject Kilauea en_US
dc.title Venting/testing KS-8 en_US
dc.type Report en_US
dc.type.dcmi Text en_US
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
1991 - Venting or Testing KS-8.pdf
Size:
6.96 MB
Format:
Adobe Portable Document Format
Description: