Abstract

The HGP-A Well underwent a substantial workover last fall. A new tie-back 7" casing was installed from surface to 3,000 ft. A two-week test was conducted in January, 1980, with full hydrogen sulfide and noise abatement. Preliminary test results showed a slight increase in total mass flow. Both noise and odor abatement were shown to be very effective. As a result of the two-week test, some changes have been made to the final design, and the projected plant on-line date has been extended to 3/31/80.

Description

Geothermal Resources Council, Transactions Vol. 4, September 1980

Keywords

engineering, reservoir assessments, Hawaii Geothermal Project, Puna, Kilauea East Rift Zone, Hawaii Island, Geothermal resources--Hawaii, Geothermal resources--Periodicals, Geothermal engineering--Periodicals, Geothermal power plants--Periodicals, Renewable energy sources--Oceania--Periodicals, Power resources--Oceania--Periodicals, Energy conservation--Oceania--Periodicals, Transactions (Geothermal Resources Council)

Citation

Progress report on HGP-A wellhead generator feasibility project. Chen BH, Lopez LP, Kuwada JT, Farrington RJ. 1980. Geothermal Resources Council, Transactions 4 (September 1980): 491- 494.

Extent

4 pages

Format

Geographic Location

Time Period

Related To

Related To (URI)

Table of Contents

Rights

Rights Holder

Local Contexts

Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.