Please use this identifier to cite or link to this item:
http://hdl.handle.net/10524/47995
Plugging procedures and suspension of drilling operations for injection well KS-7
File | Size | Format | ||
---|---|---|---|---|
1991 - Plugging Procedures and Suspension of Drilling for KS-7.pdf | 1.68 MB | Adobe PDF | View/Open |
Item Summary
Title: | Plugging procedures and suspension of drilling operations for injection well KS-7 |
Authors: | Puna Geothermal Venture |
Keywords: | injection wells Puna Geothermal Venture KS-7 geothermal wells well plugging show 8 morewell abandonments Kapoho Kilauea East Rift Zone Kilauea Puna Big Island Hawaii Island Hawaii show less |
Date Issued: | Feb 1991 |
Publisher: | Puna Geothermal Venture |
Citation: | Puna Geothermal Venture. 1991. Plugging procedures and suspension of drilling operations for injection well KS-7. Hilo (HI): Puna Geothermal Venture. |
Abstract: | "During the drilling of injection well KS-7, the Puna Geothermal Venture has encountered a high temperature, high pressure zone at depth of 1600'. This zone caused the fluid and steam release on the afternoon of February 21, 1991. Since that time the well has been shut in and is being kept in a stable condition by continuous pumping of cold water into the well bore. During this period equipment and personnel were assembled in order to plug the well. PGV is hereby requesting authorization to execute plugging and monitoring operations that we feel are required to bring the well to a stable and safe condition for the long term. This program is described in the attached document and figures." |
Pages/Duration: | 5 pages |
URI: | http://hdl.handle.net/10524/47995 |
Appears in Collections: |
The Geothermal Collection |
Please email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.
Items in ScholarSpace are protected by copyright, with all rights reserved, unless otherwise indicated.