Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/36083

Hawaii Deep Water Cable Program, phase II-D task 5.4 : feasibility of using underground electrical cables along portions of the overland route of an inter-island cable system in Hawaii

File Size Format  
1988-Aug-Phase II-D task 5.4. undergrounding.pdf 1.12 MB Adobe PDF View/Open

Item Summary

Title:Hawaii Deep Water Cable Program, phase II-D task 5.4 : feasibility of using underground electrical cables along portions of the overland route of an inter-island cable system in Hawaii
Authors:Krasnick, George
Mansur, J.
Keywords:Hawaii Deep Water Cable Program
demonstration
engineering
underground
Hawaii
LC Subject Headings:Cables, Submarine--Hawaii
Electric power transmission--Hawaii
Electric lines--Hawaii
Electric cables
Underground electric lines--Hawaii
Date Issued:Aug 1988
Publisher:Parsons Hawaii
Citation:Krasnick G, Mansur J. 1988. Hawaii Deep Water Cable Program, phase II-D task 5.4: Feasibility of using underground electrical cables along portions of the overland route of an inter-island cable system in Hawaii. (HI): Parsons Hawaii.
Series:Hawaii Deep Water Cable Program Phase II
Abstract:This report examines the feasibility of using underground cables rather than overhead lines for portions of the electrical transmission system proposed for the Hawaiian Islands as researched and developed by the Hawaii Deep Water Cable (HDWC) Program.
Pages/Duration:35 pages
URI:http://hdl.handle.net/10524/36083
Appears in Collections: The Geothermal Collection


Please email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.

Items in ScholarSpace are protected by copyright, with all rights reserved, unless otherwise indicated.