Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/23434

DOWALD staff analysis of proposed DBED termination options for the existing HGP-A well and power plant facility

File Size Format  
1989 - DLNR Analysis of Proposed DBED.pdf 93.11 kB Adobe PDF View/Open

Item Summary

Title:DOWALD staff analysis of proposed DBED termination options for the existing HGP-A well and power plant facility
Authors:Tagomori, Manabu
Keywords:Hawaii Geothermal Project
power generation
controversy
Puna
Hawaii
Date Issued:Jun 1989
Publisher:Department of Land & Natural Resources, State of Hawaii
Citation:Tagomori M. 1989. DOWALD staff analysis of proposed DBED termination options for the existing HGP-A well and power plant facility. (HI): Department of Land & Natural Resources, State of Hawaii.
Description:A memorandum from Manabu Tagomori, deputy director, to William W. Paty, chairperson.
Pages/Duration:3 pages
URI:http://hdl.handle.net/10524/23434
Appears in Collections: The Geothermal Collection


Please email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.

Items in ScholarSpace are protected by copyright, with all rights reserved, unless otherwise indicated.