Please use this identifier to cite or link to this item: http://hdl.handle.net/10524/36043

Hawaii Deep Water Electrical Transmission Cable Demonstration Program : Phase I Task 1 general management reports

Item Summary

Title: Hawaii Deep Water Electrical Transmission Cable Demonstration Program : Phase I Task 1 general management reports
Authors: Chapman, G.A.
Keywords: cable
demonstration
management
Hawaii
LC Subject Headings: Cables, Submarine--Hawaii
Electric power transmission--Hawaii
Electric lines--Hawaii
Electric cables
Underground electric lines--Hawaii
Issue Date: Apr 1982
Publisher: State of Hawaii Department of Planning and Economic Development
Citation: Chapman GA. 1982. Hawaii Deep Water Electrical Transmission Cable Demonstration Program: Phase I Task 1 general management reports. Honolulu (HI): State of Hawaii Department of Planning and Economic Development.
Abstract: Phase I: Task 1, General management reports. This Program Management Plan (PMP) has been prepared to identify and specify the administrative, technical and fiscal functions and controls that will be utilized during the Hawaii Deep Water Electrical Transmission Cable Demonstration Program (HDWC Program). The functions and controls have been developed and designed to assure that the overall Program work tasks are performed to the highest quality possible within the Program's organizational, time and budgetary constraints. Although this PMP has been prepared during the preliminary definitional phase of work (Phase I), it is intended for use by the Program Team as a working plan and directive during succeeding phases of work. As such, this PMP will be a dynamic document that will reflect changing Program conditions through revisions in design approach, scope and detail of Program elements as the project progresses.
Pages/Duration: 93 pages
URI/DOI: http://hdl.handle.net/10524/36043
Appears in Collections:The Geothermal Collection