Please use this identifier to cite or link to this item:

Geothermal working group interim report

File SizeFormat 
2010-12-BI.GeoWGInterimReport.pdf792.59 kBAdobe PDFView/Open

Item Summary

Title: Geothermal working group interim report
Keywords: economics
Issue Date: Dec 2010
Publisher: Geothermal Working Group, Hawaii County
Citation: 2010. Geothermal working group interim report. (HI): Geothermal Working Group, Hawai County.
Abstract: SCR 99 created the Geothermal Working Group to evaluate geothermal energy as the primary base power for electricity in the County of Hawaii. An analysis of the existing data and a synthesis of expert testimony evince overwhelming support for a plan of action that includes transitioning from fossil-fuel energy plants to local and renewable energy plants, while identifying and responding to public safety and environmental concerns at each stage of development. Funding for important research is required to ensure that the transition never harms people, property, or wildlife and that a robust and reliable supply of energy is always available. It is critically important to the welfare of Hawaiians that the transition begin immediately.
Pages/Duration: 72 pages
Appears in Collections:The Geothermal Collection

Items in ScholarSpace are protected by copyright, with all rights reserved, unless otherwise indicated.