| dc.contributor.author |
Dugan, Gordon L |
en_US |
| dc.contributor.author |
Gee, Henry K |
en_US |
| dc.contributor.author |
Lau, L Stephen |
en_US |
| dc.date.accessioned |
2008-12-02T02:36:02Z |
en_US |
| dc.date.available |
2008-12-02T02:36:02Z |
en_US |
| dc.date.issued |
1983-01 |
en_US |
| dc.identifier.citation |
Dugan GL, gee HK, Lau LS. 1983. Decontamination of chromium contaminated soil and water: Pearl Harbor Naval Shipyard, Pearl Harbor, Hawaii, phase 2. Honolulu (HI): Water Resources Research Center, University of Hawaii. WRRC special report, 1:10:83. |
en_US |
| dc.identifier.uri |
http://hdl.handle.net/10125/4179 |
en_US |
| dc.description.abstract |
Phase 2 of this project represents the analytical monitoring of an
estimated 64,800 ft^3 (1,835 m^3) of chromium-contaminated soil, classified
as a hazardous waste (>5 mg/l chromium extract concentration as measured by
the standard EP toxicity test), that was treated at the Pearl Harbor Naval
Shipyard during a two-month period in late 1982. Although the treatment
process details (wash-water-detention times, number of wash-water-flow through
times, and type and amount of chemicals) were the contractor's proprietary
information, the analytical monitoring treatment process essentially
followed the general treatment methods developed in Phase 1 (laboratory
and pilot plant studies). The treatment performed by Advanced Environmental
Consultants, Inc., of Pittsburgh, Pennsylvania consisted of utilizing
2 yd^3 (1.53 m^3) modified dumpsters as the soil receptacles, using upflow/
downflow washing to leach the chromium from the soil, adding a reducing
agent to chemically reduce chromium Cr+6 to Cr+3, raising the pH to approximately
8.5 to precipitate the chromium from solution and to dewater the
chromium laden sludge. Each processed soil batch (nearly all 2 yd^3 dumpster
units) were monitored for chromium extract. Only 35 of approximatley 1200
dumpster loads were above the 5-mg/l limit, and these were reprocessed. |
en_US |
| dc.description.sponsorship |
U.S. Dept. of the Navy, Pac. Div.
Naval Facilities Engrg. Command
Pearl Harbor, Hawaii 96860 Grant/Contract No. N62742-82-C-0001 |
en_US |
| dc.format.extent |
iv + 37 pages |
en_US |
| dc.language.iso |
en-US |
en_US |
| dc.publisher |
Water Resources Research Center, University of Hawaii |
en_US |
| dc.relation.ispartofseries |
WRRC Special Reports |
en_US |
| dc.relation.ispartofseries |
1:10:83 |
en_US |
| dc.subject |
chromium |
en_US |
| dc.subject |
soil contamination effects |
en_US |
| dc.subject |
soil treatment |
en_US |
| dc.subject |
Hawaii |
en_US |
| dc.subject |
Pearl Harbor Naval Shipyard |
en_US |
| dc.subject |
Oahu |
en_US |
| dc.subject.lcsh |
Chromium -- Environmental aspects. |
en_US |
| dc.subject.lcsh |
Pearl Harbor (Hawaii) |
en_US |
| dc.subject.lcsh |
Soil pollution -- Hawaii -- Oahu. |
en_US |
| dc.subject.lcsh |
Soils -- Leaching. |
en_US |
| dc.title |
WRRCSR No.1:10:83 Decontamination of Chromium Contaminated Soil and Water: Pearl Harbor Naval Shipyard, Pearl Harbor, Hawaii, Phase 2 |
en_US |
| dc.type |
Report |
en_US |
| dc.type.dcmi |
Text |
en_US |