| dc.contributor.author |
Chen, Bill H |
en_US |
| dc.contributor.author |
Lopez, Louis P |
en_US |
| dc.contributor.author |
Kuwada, James T |
en_US |
| dc.contributor.author |
Farrington, Ray J |
en_US |
| dc.date.accessioned |
2012-02-29T20:53:32Z |
en_US |
| dc.date.available |
2012-02-29T20:53:32Z |
en_US |
| dc.date.issued |
1980-09 |
en_US |
| dc.identifier.citation |
Progress report on HGP-A wellhead generator feasibility project. Chen BH, Lopez LP, Kuwada JT, Farrington RJ. 1980. Geothermal Resources Council, Transactions 4 (September 1980): 491- 494. |
en_US |
| dc.identifier.uri |
http://hdl.handle.net/10125/22110 |
en_US |
| dc.description |
Geothermal Resources Council, Transactions Vol. 4, September 1980 |
en_US |
| dc.description.abstract |
The HGP-A Well underwent a substantial workover last fall. A new tie-back 7" casing was installed from surface to 3,000 ft. A two-week test was conducted in January, 1980, with full hydrogen sulfide and noise abatement. Preliminary test results showed a slight increase in total mass flow. Both noise and odor abatement were shown to be very effective. As a result of the two-week test, some changes have been made to the final design, and the projected plant on-line date has been extended to 3/31/80. |
en_US |
| dc.description.sponsorship |
Department of Energy Contract DE-AC03-78ET28420, State and County of Hawaii, and Hawaii Electric Light Company |
en_US |
| dc.format.extent |
4 pages |
en_US |
| dc.language.iso |
en-US |
en_US |
| dc.publisher |
Research Corporation of the University of Hawaii |
en_US |
| dc.publisher |
Rogers Engineering Co., Inc. |
en_US |
| dc.subject |
reservoir engineering |
en_US |
| dc.subject |
reservoir assessment |
en_US |
| dc.subject |
Puna |
en_US |
| dc.subject |
Kilauea East Rift Zone |
en_US |
| dc.subject |
Hawaii Island |
en_US |
| dc.title |
Progress report on HGP-A wellhead generator feasibility project |
en_US |
| dc.type |
Report |
en_US |
| dc.type.dcmi |
Text |
en_US |