Progress report on HGP-A wellhead generator feasibility project

Date
1980-09
Authors
Chen, Bill H.
Lopez, Louis P.
Kuwada, James T.
Farrington, Ray J.
Contributor
Advisor
Department
Instructor
Depositor
Speaker
Researcher
Consultant
Interviewer
Annotator
Journal Title
Journal ISSN
Volume Title
Publisher
Research Corporation of the University of Hawaii
Rogers Engineering Co., Inc.
Geothermal Resources Council
Volume
Number/Issue
Starting Page
Ending Page
Alternative Title
Abstract
The HGP-A Well underwent a substantial workover last fall. A new tie-back 7" casing was installed from surface to 3,000 ft. A two-week test was conducted in January, 1980, with full hydrogen sulfide and noise abatement. Preliminary test results showed a slight increase in total mass flow. Both noise and odor abatement were shown to be very effective. As a result of the two-week test, some changes have been made to the final design, and the projected plant on-line date has been extended to 3/31/80.
Description
Geothermal Resources Council, Transactions Vol. 4, September 1980
Keywords
engineering, reservoir assessments, Hawaii Geothermal Project, Puna, Kilauea East Rift Zone, Hawaii Island, Geothermal resources--Hawaii, Geothermal resources--Periodicals, Geothermal engineering--Periodicals, Geothermal power plants--Periodicals, Renewable energy sources--Oceania--Periodicals, Power resources--Oceania--Periodicals, Energy conservation--Oceania--Periodicals, Transactions (Geothermal Resources Council)
Citation
Progress report on HGP-A wellhead generator feasibility project. Chen BH, Lopez LP, Kuwada JT, Farrington RJ. 1980. Geothermal Resources Council, Transactions 4 (September 1980): 491- 494.
Extent
4 pages
Format
Geographic Location
Time Period
Related To
Table of Contents
Rights
Rights Holder
Local Contexts
Email libraryada-l@lists.hawaii.edu if you need this content in ADA-compliant format.